There is a new project (21 storey, 420 units) coming up behind Jalan Mahkota Hills 1.
The project will affect the traffic and security of the community.
The number of house and traffic will increase by 211%.
The massive piling work will damage the house at Jalan Mahkota 10 & Mahkota Hills.
The project will affect the traffic and security of the community.
The number of house and traffic will increase by 211%.
The massive piling work will damage the house at Jalan Mahkota 10 & Mahkota Hills.
There is no proper access/main road link to this project.
The traffic will flow through a bottle neck at Jalan Mahkota 7 which is a 40' wide road.
有一个新的项目(21层,420个单位)在Jalan Mahkota Hills 1 后面。
该项目将严重的影响本社区的交通流量和治安。房子和交通流量的将增加超过211%。
大量的打桩工作会破坏第10和 Hills 路的房屋。此项目没有合适的主要道路连结。
此计划将带来严重的交通瓶颈,交通需经过只有40尺宽的第7路。
The project will bring an extra 800 to 1000 cars here.
The traffic will flow through a bottle neck at Jalan Mahkota 7 which is a 40' wide road.
有一个新的项目(21层,420个单位)在Jalan Mahkota Hills 1 后面。
该项目将严重的影响本社区的交通流量和治安。房子和交通流量的将增加超过211%。
大量的打桩工作会破坏第10和 Hills 路的房屋。此项目没有合适的主要道路连结。
此计划将带来严重的交通瓶颈,交通需经过只有40尺宽的第7路。
The project will bring an extra 800 to 1000 cars here.
If there are 900 extra cars, the number of cars trips going in and out per day will be very huge:
该项目将为这里带来额外800至1000的车辆。如果有900额外车,每天来往的车辆数量将非常庞大:
x 2 trips 次 =
1800 cars 车次
x 3 trips 次 =
2700 cars 车次
x 4 trips 次 = 3600 cars 车次
x 4 trips 次 = 3600 cars 车次
Base on the project plan, the main access for the project is at Jalan Mahkota 9.